277
edits
Changes
Signals
,→Placing of signals
===Placing of signals===
* one (the first) left mouse button click = two way signal will be placed on a railway track <br>* two (a second ) left mouse button click on the same signal = two way signal will be transformed to one way signal <br>(You decide which way a one-way signal will orientate by which side of the track we clicked on will determine you click. Yes, this might at first come across as slightly difficult, but zoom in and you'll soon get the orientation hang of it. The game defaults to automatically selecting which type of the signal to place, as well as defaulting to two-way signals. You can change to manual selection as well as one-click one way signal)signals in [[Game Settings]].
Signals cannot be placed at station platforms and directly on railway intersections. Signals are hard to place in tunnels, but you can get around this by using the multi-signal tool: it will space signals correctly to allow for efficient use of longer tunnels. (It is admittedly hard to delete those signals without deleting the whole expensive tunnel though)