User:CapnZapp/test
From Mashinky
1st Era
coal, timber; 50/90 mph/kph rail
2nd Era
iron
3rd Era
diesel; 70/113 rail
Steam:
Diesel:
4th Era
steel Steam:
Diesel:
5th Era
high-speed (112/180) rail; electric high-speed (112/180) rail
Steam:
Diesel:
- Sasha 871 Cost -6000 -40 -40 Run 68 mph up to 650t
- V220 Cost -10000 -30 Run 87 mph up to 270t
- EMD F7 Cost -2900 -30 -90 Run 81 mph up to 543t
Electric:
6th Era
high speed (112/180) rail; electricity
Diesel:
Electric:
7th Era
concrete
Diesel:
Electric:
- Aries Cost -40000 -150 -80 Run 143/230 up to 567t
- 60E Cost -10000 Run 87/140 up to 676t
- Lok 460 Cost -18000 -120 Run 124/200 up to 536t