Open main menu

Mashinky β

Changes

Electrification

1 byte removed, 05:53, 11 March 2020
Building the infrastructure
Please note the icon in right upper corner (red arrow) - that is overlay toggle button. You can turn the color overlay on/off. That button works separately for each building menu. It is strongly advised to have it on for building electrical network, it will help to avoid disconnected wires.
You can use 2 different electrical poles over the land, underwater cable to cross water areas (electrical poles are it is not possible to place electrical poles on the bridges) and transformer station (it contains large electrical pole).
There are two ways of building the lines. <br><br>
1) You can click and place each pole separately - that gives you the freedom of winding lines around difficult terrain, but could be time consuming and you have to be careful to place next pole within the reach area of the previous pole.<br>
The electrical poles cannot share a square with track, even if the track crosses just the corner of the square. But the poles can be built on half-squares where the other half is a rock.
The underwater cable nodes must be placed on neighbouring squares, so you need to prepare the underwater surface with bulldozer to eliminate any rocky areas (you CAN use bulldozer on underwater terrain)   
==The Tools==
1,232
edits